Subcontracting vs external processing in S/4HANA: tell them apart by their postings
Both of these mean “someone outside does part of the work.” They are configured differently, they post differently, and picking the wrong one gives you a cost structure you cannot analyse later. The fastest way to keep them straight is not the definition — it is the accounting entry each one produces. What follows are the actual postings from two products made side by side in the same S/4HANA client: kimchi dumplings made by a subcontractor , and shrimp dumplings made in-house with one outsourced operation . Subcontracting: the vendor makes the product We buy the semi-finished product as work . We supply the raw materials, the subcontractor shapes them, and a single goods receipt settles the entire arrangement. That one document fires several OBYC account-determination keys at once: Posting at the subcontract goods receipt Amount OBYC key Dr 5080 raw material consumed — supplied to subcontractor 4,200 GBB · VBO Cr 1050...